Trans Asia Pipeline Servicescompletes pipeline precommissioning Contract for Technip

Trans Asia Pipeline Services today announced that it has completed a major contract to provide subsea pipeline precommissioning services forTechnip, Abu Dhabi.

Technip was awarded by Dubai Petroleum an engineering, procurement, installation and commissioning (EPIC) contract for the South West Fatah and Falah fields, located 90 kilometers offshore Dubai, United Arab Emirates, at a water depth up to 53 meters.

The contract scope includes the replacement of a 12-inch gas pipeline and six 18-inch water injection pipelines.

The pre commissioning scope of work involved the subsea flooding, hydro testing and dewatering with nitrogen for the pipelines

“We are very pleased that the pre-commissioning operation for Technip on the Dubai Petroleum Project was carried out safely and efficiently,” said D .Surendranath, Managing Director of Trans Asia Pipeline Services. “The entire operation was completed on a tight schedule considering that the platform had to be shut down for the replacement of the gas pipeline and any delays would have resulted in considerable production losses,” he added.

Trans Asia Pipeline Services is a leading provider of pipeline and process pre commissioning services to the petroleum industry. The company operates through their bases in UAE, India and Singapore.