Client | EPC Contractor | Project Title | Dia | Length | Scope of Work | Location |
(Inches) | km | |||||
South Oil Company (SOC) | Leighton Offshore | Crude Oil Export Facilities Project | 48” (5 Pipelines) | 65 | Flood, Clean, Gauge, Hydrotest, Leak Testing, Dewatering and Commissioning with Crude | Iraq |
Saudi Aramco | McDermott Arabia Company Limited/ J.RayMcdermott | Maintain Potential Facilities Project | 20”/ 16” (3 Pipelines) | 5.3 | Flooding, Cleaning, Gauging, Hydro testing, Baseline survey , Wet Layup | Saudi Arabia |
Oil and Natural Gas Corporation (ONGC) | Swiber Offshore Construction Pte. Ltd | Cluster 7 Pipeline Project | 16” / 14” /12” 10” /8” /6” / 4” (21 Pipelines) | 211 | Flooding, Cleaning, Gauging & Hydro-testing | India |
ConocoPhillips | Swiber Offshore | South Belut Project | 14”/ 8” (8 Pipelines) | 40 | FCG, post tie in Leak Test, Dewatering, Gel Pigging, Dewatering with Nitrogen | Indonesia |
Total Abu Al Bukhoosh | Rosen | Intelligent Pigging Project Contract No:4800000158 | 30”/ 20” / 16” 10” /8” / 6” (15 Pipelines) | 159 | Support services for Intelligent Pigging of Pipelines | Abu Dhabi |
Mangalore Refinery and Petrochemicals Limited (MRPL) | Leighton Offshore | MRPL Refinery Project | 48” | 17.4 | Flooding, Cleaning, Gauging, Hydrotest, Leak Testing of SPM | India |
Abu Dhabi Gas Industries (GASCO) | Larsen and Toubro | Habshan- Ruwais –Sweihat Pipeline Project | 52” / 48” | 137 | Supply of equipment and Manpower for pipeline Pre commissioning | Abu Dhabi |
Petro Vietnam PTSC | Hyundai Heavy Industries | Thang Long Dang Do Project | 10” / 8” / 6” (15 Pipelines) | 18 | FCG, Hydrotest, Post Tie in Leak Test | Vietnam |
Abu Dhabi Gas Industries (GASCO) | Alsa Engineering and Construction | Mirfa -Ruwais Nitrogen Pipeline Project | 16” | 75 | Supply of equipment and Manpower for pipeline Pre commissioning | Abu Dhabi |
Mubadala Petroleum | Swiber Offshore | Pearl Oil Ruby Pipeline | 14” | 312 | FCG, Hydrotest, Caliper Pigging, Dewatering, Vacuum Drying, Nitrogen packing | Indonesia |
Abu Dhabi Company for Onshore Operations (ADCO) | Galfar Engineering and Contracting Emirates LLC | Bab Gas Surface Facilities Modifications & Remedial Works(CONTRACT No.15267.01/EC 10799) | 10” / 8” / 6” (14 Pipelines) | 32 | Flooding, Cleaning, Gauging, Hydro-testing, De-watering, Swabbing, Drying, Nitrogen Purging | Abu Dhabi |
Brunei Shell Petroleum | Swiber Offshore | Champion Water Flood | 16” / 12” / 8” (12 Pipelines) | 29.5 | Flooding, Cleaning, Gauging, Hydro-testing, Leak Testing | Brunei |
Dubai Petroleum | Technip (Abu Dhabi) | Pipeline Replacement Project | 30” / 18” /12” (8 Pipelines) | 34 | Flooding, Cleaning, Gauging, Hydro-testing, De-watering with nitrogen | Dubai |
Oil and Natural Gas Corporation(ONGC) | Subsea 7 | GS-1 GS-15 Deep sea Project | 10” / 8” (3 Pipelines) | 55 | Flooding, Cleaning, Gauging, Hydro-testing, De-watering, Glycol Swabbing, Baseline Survey, Nitrogen Purging | Kakinada , India |
Vopak Horizon Terminals Limited | Cylingas LLC | VHFL Tank Farm Project | 39m dia (9 Tanks) | - | Hydrotesting of Crude and Product Storage Tanks | Fujairah |
Brunei Shell Petroleum (BSP) | Swiber Offshore | Bulan-Bulan, Osprey Project | 16” / 12” / 10” (4 Pipelines) | 37.1 | FCG, Hydrotest, Dewatering, Nitrogen packing | Brunei |
Client | EPC Contractor | Project Title | Dia | Length | Scope of Work | Location |
(Inches) | km | |||||
Saudi Aramco | McDermott Arabia Company Limited/ J.Ray.McDermott | Safaniya Field Dev Project (Phase-1) | 16” (6 Pipelines) | 35 km | De-cruding, Flooding, Cleaning, Gauging , Hydrotesting and Wet Layup | Saudi Arabia |
ConocoPhillips | Kreuz Subsea/ PT RajawaliSwiberCakrawala | Bawal Field Development Project | 14” | 40km | Dewatering & Nitrogen Packing | Indonesia |
Indian Oil Corporation (IOCL) | Hyundai Heavy Industries | IOCL Paradip SPM Project | 48” (5 Pipelines) | 69 km | Flooding, Cleaning, Gauging, Hydrotesting, Leak Testing, Caliper EGP Survey ,Leak Testing of SPM Systems | India |
Abu Dhabi Company for Onshore Operations (ADCO) | Galfar Engineering and Contracting Emirates LLC | Segregation of units 6 & 7 and D Flow lines (CONTRACT No. 15166.01 / EC 10780) | 8” (9 Pipelines) | 3.92 | Flooding, Cleaning, Gauging, Hydro-testing, De-watering, Swabbing, Drying, Nitrogen Purging | Abu Dhabi |
Govt. of Tanzania | Leighton Offshore | Tanzania SPM Project | 28”/24” (2 Pipelines) | 14.9 | Flooding, Cleaning, Gauging, Hydrotest, Leak Testing of SPM Systems | Tanzania |
Brunei Shell Petroleum | Swiber Offshore | Danau-Bubut Subsea Development | 12” | 21 | Flooding, Cleaning, Gauging, Hydrotesting, Dewatering and Nitrogen Packing | Brunei |
Alliance LNG/ Petronas | Stone House/ Maser Offshore | Alliance LNG Re-Gasification Project | 30” | 4 | Flooding, Cleaning, Gauging, Hydrotesting, Dewatering and Drying | Malaysia |
British Gas Exploration & Production India Limited | Punj Lloyd Limited | Panna SBM Project | 12” | 3 | Flooding, Cleaning, Gauging & Hydro-testing, Leak Testing of SPM System | India |
Abu Dhabi Gas Industries (GASCO) | Union Gas Company | Jindal Steel Plant Pipeline Project | 8” | 1.5 | Flooding, Cleaning, Gauging, Hydro-testing, De-watering, Swabbing, Drying, Nitrogen Purging | Abu Dhabi |
Oil and Natural Gas Corporation (ONGC) | Swiber Offshore Construction Pte. Ltd | D1 Pipeline Project | 16” / 14” / 12” / 4” (4 Pipelines) | 18 | Flooding, Cleaning, Gauging & Hydro-testing | India |
Abu Dhabi Gas Industries (GASCO) | Engineering Maintenance Company (EMCO) | Replacement 0f 10” and 16” Gas Pipeline GASCO-BAB(CONTRACT No. 158009101) | 16”/12”/10” (2 Pipelines) | 5.3 | Flooding, Cleaning, Gauging, Hydro-testing, De-watering, Swabbing, Drying, Nitrogen Purging | Abu Dhabi |
Oil and Natural Gas Corporation (ONGC) | Swiber Offshore Construction Pte. Ltd | B-193 Subsea Pipeline Project | 16” / 12” / 10”/ 8” /2” (14 Pipelines) | 214.3 | Flooding, Cleaning, Gauging & Hydro-testing | India |
ENOC Lubricants and Grease Manufacturing | Cylingas LLC | ELOMP Tank Farm Project | 15/7.5/5.3 m dia (7 Tanks) | Fresh Water cleaning and blasting of Product Storage Tanks | Fujairah | |
Oil and Natural Gas Corporation (ONGC) | Valentine Maritime Ltd / Valentine Maritime Mauritius Ltd | B Series & N 15 & N16 Pipeline Project | 16”/ 14”/ 10” /8” (4 Pipelines) | 51.35 | De-watering Drying & N2 Purging of Subsea Pipelines | India |
Vopak Horizon Terminals Limited | Cylingas LLC | VHFL Tank Farm Project | 39m dia (6 Tanks) | - | Hydrotesting of Crude and Product Storage Tanks | Fujairah |
Client | EPC Contractor | Project Title | Dia | Length | Scope of Work | Location |
(Inches) | km | |||||
Santos Energy | Swiber Offshore Constructions Pte Ltd | Wortel Field Development Project | 10” | 10.4 | Flooding, Cleaning, Gauging, Hydro-testing, De-watering, Swabbing, Drying, Nitrogen Purging | Madura Straits, Indonesia |
Dubai Petroleum | Technip (Abu Dhabi) | Jalilah Field Development Project | 12” / 6” (2 Pipelines) | 54 | Flooding, Cleaning, Gauging, Hydro-testing, De-watering with nitrogen | Dubai |
Brunei Shell Petroleum | Swiber Offshore Constructions Pte Ltd | Champion Water Flood Project | 8” | 1.1 | Flooding, Cleaning, Hydrotesting of internally HDPE Lined Pipeline | Brunei |
Oil and Natural Gas Corporation(ONGC) | Leighton Offshore | GS-1 GS-15 Deep sea Project | 10” / 8” (3 Pipelines) | 55 | Flooding, Cleaning, Gauging, Caliper survey and Hydro testing | Kakinada, India |
Oil and Natural Gas Corporation(ONGC) | Swiber Offshore Constructions Pte Ltd | North Tapti Gas Field Development Project | 18” / 12” (2 Pipelines) | 17.5 | Flooding, Cleaning, Gauging, Hydro-testing, De-watering, Swabbing, Drying, Nitrogen Purging | India |
Gas Authority of India Limited (GAIL) | Fernas Constructions | Dahej –Viajypur (Phase-II) Pipeline Project | 48” (3 Sections) | 290 | Bulk Dewatering, Swabbing, Drying, Caliper survey and Vacuum Drying | India |
Oil and Natural Gas Corporation (ONGC) | Leighton Offshore Contractors Pvt Ltd | Pipeline Replacement Project (Phase-III) | 14”/ 12”/ 10” /6” (12 Pipelines) | 79.8 | Flooding, Cleaning, Gauging & Hydro-testing | India |
Oil and Natural Gas Corporation(ONGC) | Swiber Offshore Constructions Pte Ltd | Mumbai High North Re Development Project | 14”/12”/10”/ 8”/ 6” (14 Pipelines) | 90 | Flooding, Cleaning, Gauging & Hydro-testing | India |
Client | EPC Contractor | Project Title | Dia | Length | Scope of Work | Location |
(Inches) | km | |||||
Abu Dhabi Gas Industries (GASCO) | AL Fannar Contracting | Gas Supply Pipeline | 24” | 2.7 | Flooding, Cleaning, Gauging, Hydro-testing, De-watering, Swabbing, Drying, Nitrogen Purging | Abu Dhabi |
Abu Dhabi Company for Onshore Operations (ADCO) | Al Hussam Contracting | Bab Fields Replacement Pipeline | 6” / 8” 8” | 30 | Flooding, Cleaning, Gauging, Hydro-testing, De-watering, Swabbing, Drying, Nitrogen Purging | Abu Dhabi |
Ceylon Petroleum | Leighton Contractors Pvt Ltd | Muthurajawela Tank Farm Project | 16” | 9.1 | Flooding, Cleaning, Gauging, Caliper Pigging and Hydro-testing | Sri Lanka |
Hindustan Petroleum Corporation (HPCL) | Leighton Offshore | Vizag Refinery Project | 48” | 5.5 | Flooding, Cleaning, Gauging, Hydrotest, Leak Testing of SPM Systems | India |
Client | EPC Contractor | Project Title | Dia | Length | Scope of Work | Location |
(Inches) | km | |||||
Saudi Aramco | McDermott Arabia Company Limited/ J.Ray.McDermott | Long Term Agreement Project | 16” (5 Pipelines) | 30 km | Flooding, Cleaning, Gauging ,Hydrotesting and Wet Layup | Saudi Arabia |
Oil and Natural Gas Corporation (ONGC) | Leighton Offshore Contractors Pvt. Ltd | Pipeline Replacement Project (Phase-2) | 24”/16”/ 12” / 8” / 6” (17 Pipelines)” | 58.4 | Flooding, Cleaning, Gauging & Hydro-testing | Bombay High, India |
Oil and Natural Gas Corporation (ONGC) | Global Industries Pvt. Ltd | Pipeline Replacement Project (Phase-1) | 18”/16”/ 12” (6 Pipelines) | 54.2 | Flooding, Cleaning, Gauging & Hydro-testing | Bombay High, India |
Oil and Natural Gas Corporation (ONGC) | Punj Lloyd Limited | Heera Redevelopment Project | 16”/14”/ 12”/10”/8” (11 Pipelines) | 69.1 | Flooding, Cleaning, Gauging & Hydro-testing | Heera Field, India |
British Gas Exploration & Production India Limited | Swiber offshore Constructions Pvt Ltd | BG Hydra Pipeline Project | 14”/12”/ 4”/1.25” (6 Pipelines) | 52.7 | Flooding, Cleaning, Gauging & Hydro-testing, High speed Flushing ,Dewatering, Drying and Nitrogen Packing | Tapti Field, India |